PLANNING
PLANNING
The
planning process of the
project is designed to identify goals, issues and construction
strategies. The master schedule is designed on a conceptual
basis
from design all the way through construction, integrating value
engineering, constructability reviews and procurement. The
total
plan’s master schedule is analyzed accordingly with the
Owner’s priorities, specific requirements, manpower and
equipment
and material deliveries to determine logical and constructive
sequences. Value Engineering reports and analysis are
included in
the master schedule. Following the analysis and utilizing
Owner’s information, a target completion date is obtained.
Milestone dates and agency submittal dates are included in the design
and construction schedules. This schedule will provide all
participants with a clear understanding of the sequence of activities
required and will serve as the basis for detailed construction
schedules by the contractor.
|

|
|
|
|
|